Professional Experience


National Projects & Construction LLC - Abu Dhabi - UAE.

Aug 2010 To Till Date

Designation

:

Construction Manager – Finishes

Highlights

  • Project Engineer Finishes at Nation Tower Abu Dhabi for The two buildings are located directly at the Abu Dhabi Cornice and have 65 and 52 floors. The Nation Towers were completed in 2013 and have apartments, offices, a shopping mall and a hotel (St. Regis Hotel Abu Dhabi). The complex offers approximately 278,709 meters of usable space. This includes a 5-star hotel with 350 rooms, spas and a fitness facility. It is also home to upscale boutique shops geared towards high-end consumers. Both buildings are connected with a sky bridge at a height of 202.5 meters which connects floors 50 and 54. The sky bridge is the highest in the world at the time of construction.
  • Project Engineer Finishes at Rehaan Heights Abu Dhabi for The project comprises of five residential towers and home to 868 apartment unities and 14 exclusive villas around the perimeter,
  • Project Engineer Finishes for handover of 97 Keys, Public Areas and F.O.H of Al Raha Hotel Extension Abu Dhabi.
  • Project Engineer Finishes for VEDC Zayed Military City Abu Dhabi, construction of Leadership training building, Service yard, 7 building of 3 floor each Accommodation buildings, Community Centre building, Guard house and external works – pedestrian & traffic roads, hard and soft landscaping.
  • Project Engineer Finishes at 2000 Villa project for Emirati Housing Ain Al Fayda Al Ain, Construction and completion of 2000 government villas and required community facility in the relevant community of the development.
  • Project Engineer Finishes for Al Muwaiji School Al Ain for Abu Dhabi Education Counsel ADEC.
  • Significantly involved in supervising, coordinating and guiding the team both in-house and sub contractors to achieve the targeted Finishes on the project with safety and quality standards.
  • Coordination and follow up of MEP works.
  • Efficiently & effectively worked on various prestigious projects viz., First Freehold Towers in Dubai Marina, Dubai Festival City.
  • Dexterously involved in the various stages of Quality Analysis/ Quality Check and consultant’s inspection, snagging, de-snagging, etc.
  • Contractors Representative for the Entire Development for De Snagging, Home Owners Snags, Final Hand Over.

Jasco International FZC – Sharjah - UAE

Mar 2009 To June 2010

Designation

:

Project Engineer – Finishes

Highlights


Projects Handled
  • Construction Manager for Rotana and Centro Hotel Development, Yas Island Abu Dhabi, Five star plus, 9 floors + Public area. Finishes and Fit-Out package. Centro 259 guest rooms and Rotana 313 guest rooms. Including Public area of both the hotel including Ball room, Meeting room, Indian and Steak Restaurant, All Day Dining, Main lobby, Health and SPA, Public Corridor with high end luxury finish. Facilities like swimming pool, Squash courts, Gyms etc. for both Towers.
  • Construction Manager finishes for Meydan Race Course – Dubai , Grand Stand Finishes and Fit-Out package for wooden wall cladding, Public toilet doors, two shops, locker room, and reception kiosk with high end finish.
  • Construction Manager Finishes for Tandoshi and Ozone Restaurant – Dubai Japanese Restaurant Complete Finishes and Fit-Out package Including Live Kitchen, Tapyanki Counter, Public Sitting with all wooden decorative walls cladding and ceiling.
  • Deliver quality and style for clients whilst maximizing revenue and profit, alongside effective management
  • Drawing up and finalizing contracts with clients.
  • Manage workflow, oversee the completion of activities and communicate progress to stakeholders.
  • Conduct market research and facilitate design review and build planning meetings.
  • Review contractor performance for conformance to contracts, as well as authorize invoices for payment.
  • Able to make BOQ and Quotations from the designs.

Project Gallery/Images

View Project Gallery Rotana Hotel
View Project Gallery Yas Island Abu Dhabi
View Project Gallery Centro Hotel
View Project Gallery Eastern Mangroves Development Abu Dhabi
View Project Gallery Zone Restaurant Dubai Lotus Hotel

Consonni Company, Abu Dhabi - UAE.

May 2007 To Feb 2009

Designation

:

Projects Engineer – Finishes

Highlights

  • Served as a Site Project Engineer for re-modelling the designs and built works on a Signature Villa in Palm Jumeira, involving Structural, MEP, Home Automation, Landscaping, Interior Fit-Out and Furniture, all in high end & high standards.
  • Played an active role in coordinating, inspecting, monitoring of progress and approving the entire sub contract works and shop drawings also reviewed and provided inputs on contract documents.
  • Coordination
  • Coordination
Projects Handled
  • Site Project Engineer, Renaissance Hotel Development, Motor City, Dubai
    • The project aimed at 365 Rooms including Executive and Presidential Suites, Public Areas, etc.
    • Oversaw the Finishes and Fit-out works, major roles involved tender, associated in sub- contractor finalization, liaising and coordination for overall programme of works, daily site programme and progress along with the quality, material proposals and approvals.
    • Involved in drawing co-ordination and approvals, material procurement, sub-contractor follow-up, weekly client meetings, liaising & coordinating with Main Contractor, Design Consultant and Sub Contractor.
    • Instrumental in liaising, executing, supervising, coordinating and controlling HSE, quality, design, material and progress.
  • Project Engineer, Holiday INN Al Barsha, Dubai
    • Involved in the supervision, execution, coordination of supply and installation of Furniture and furnishing works for Holiday Inn, Dubai for its 95 Suites various specialty Restaurants, All day dining, lobbies, etc.
    • project
    • project
  • Projects Coordinator
    • Coordinated, supervised and managed various jobs in Dubai and Northern Emirates, like Shops/Boutiques and restaurants in malls, ICAD Head office, ADMA GM and conference room.
    • Significantly involved in designing concepts, coordinating with Client, Consultant, various trade sub contractors, following accounts and payments, purchases, allocation of resources, appointing sub contractors, checking supervising and maintaining, quality progress and safety to clients’ satisfaction.

Projects Undertaken:

  • Five star plus, Renaissance Hotel Development, Motor City Dubai, 27 floors + 3 storey public area. Finishes and Fit-Out package.
  • ZonesCorp H.O. Abu Dhabi, Finishes and Fit-Out package of 3 floors @ 3500 sqm of luxury high end finish.
  • Adma-Opco H.O. Abu Dhabi, Finishes and Fit-Out package of Board Room, Meeting Room, Corridors with high end luxury finish.

Project Gallery/Images

View Project Gallery Zone Corp

Raad Establishment Dammam, KSA.

Nov 1997 To March 2006

Designation

:

Project Engineer

Highlights

  • Functioned as a Site Engineer and involved in the construction of civil work for personal villa for individuals.
  • Significantly involved in various activities like surveying, material take offs and orders, supervising foremen and workers, making daily reports, meetings, coordinating with in-house departments like estimation, drawing and design, liaising with consultants on design issues and approvals.
  • Dexterously involved in project coordination for the Finishes Division.
  • Oversaw the post and pre tender quantity surveying, estimation of complete coordination of works of finishes division mostly Aluminium Kitchen, Window, doors, Small scale garage and workshop, and Carpentry/Joinery.
  • Instrumental in coordinating and supervising on In-house and direct external Projects dealing with suppliers, etc.